JENSONN POWER SYSTEM

Project Case Study: Woha, Indonesia

Deployment of 7MW Diesel Power Plant

IN

Project Overview

Location:
Woha, Indonesia

Project Type:
Bridging Power Solution

Installed Capacity:
7MW

Objective:
Provide reliable power to address power shortage issue

Initial Situation


Key Challenges

Remote project location

Limited existing infrastructure

Urgent deployment timeline

Fuel logistics and storage requirements

Environmental and regulatory considerations

Proposed Solution

7MW Diesel Power Plant Deployment

  • Rapid deployment solution
  • Modular generator configuration
  • Reliable and continuous power supply
  • Scalable for future demand

Technical Configuration

Implementation Timeline

1.

Site Assessment

2.

Engineering & Design

3.

Equipment Mobilization

4.

Installation

5.

Testing & Commissioning

Logistics & Execution

Key Highlight

Fast-track deployment under challenging conditions

Results Achieved

Delivered stable 7MW power supply

Significant reduction in outages

Improved reliability of electricity

Immediate operational improvements

Project Photos

Project Impact

Restoration of business operations
Increased productivity
Support for local economic activity
Improved quality of power supply

Conclusion

Successful delivery of reliable power solution in Woha

Demonstrated capability in remote project execution
Scalable and replicable model for similar locations

The future of power generators for generations

Jensonn - Logo