JENSONN POWER SYSTEM
Project Case Study: Woha, Indonesia
Deployment of 7MW Diesel Power Plant
IN
Project Overview
Location:
Woha, Indonesia
Project Type:
Bridging Power Solution
Installed Capacity:
7MW
Objective:
Provide reliable power to address power shortage issue
Initial Situation

- Power Supply Challenges
- Insufficient grid capacity
- Frequent power interruptions
- Unreliable electricity supply
- Impact
- Disrupted operations
- Reduced productivity
- Constraints on local development
Key Challenges
Remote project location
Limited existing infrastructure
Urgent deployment timeline
Fuel logistics and storage requirements
Environmental and regulatory considerations
Proposed Solution
7MW Diesel Power Plant Deployment
- Rapid deployment solution
- Modular generator configuration
- Reliable and continuous power supply
- Scalable for future demand
Technical Configuration
- Total Installed Capacity: 7MW
- Generator Setup:Â 7 Ă— 1MW units
- Fuel Type: Diesel
- Supporting System
- Fuel storage tanks
- Power distribution system
- Control and monitoring system
Implementation Timeline
1.
Site Assessment
2.
Engineering & Design
3.
Equipment Mobilization
4.
Installation
5.
Testing & Commissioning
Logistics & Execution
- Transportation of equipment to Woha
- Site preparation and civil works
- Mechanical and electrical installation
- System integration and testing
Key Highlight
Fast-track deployment under challenging conditions
Results Achieved
Delivered stable 7MW power supply
Significant reduction in outages
Improved reliability of electricity
Immediate operational improvements
Project Impact
Restoration of business operations
Increased productivity
Support for local economic activity
Improved quality of power supply
Conclusion
Successful delivery of reliable power solution in Woha
Demonstrated capability in remote project execution
Scalable and replicable model for similar locations